sb_dlg.dcl — Schedule/Bill Configuration¶
File: sb_dlg.dcl
Version: v3.60
Category: Dialog Definitions
Size: 5.7 KB (172 lines)
Note
Material Schedules and Bills
Generate material schedules, bills of materials (BOM), and quantity takeoffs for panels including concrete, rebar, embeds, and hardware.
Functional Purpose¶
Schedule/Bill Generation - Automatically generates material schedules and quantity takeoffs from panel configurations for purchasing, estimating, and fabrication planning.
Key Functions:
Concrete quantities (volume, weight by panel/project)
Rebar schedules (bar marks, sizes, quantities, lengths)
Embed schedules (plates, inserts, hardware)
Hardware lists (bolts, anchors, accessories)
Cost estimates (material costs)
Purchase orders (formatted for ordering)
Typical Workflow¶
1. User selects panels (single or multiple)
2. User opens sb_dlg (Reports ? Schedule/BOM)
3. User selects schedule type: Rebar
4. System calculates:
• Total linear feet of each bar size
• Number of bars of each type
• Bent shapes vs straight
5. Rebar schedule generated:
| Mark | Size | Length | Qty | Total LF |
|------|------|--------|-----|----------|
| A1 | #5 | 12'-0" | 40 | 480 |
| A2 | #4 | 10'-0" | 60 | 600 |
6. Export to PDF/CSV for fabricator/supplier
Control Semantics¶
Schedule Type:
sb_type- Schedule dropdown:Concrete volume/weight
Rebar schedule
Embed schedule
Hardware list
Complete BOM (all materials)
Panel Selection:
sb_panels- Panel scope:Current panel only
Selected panels
All panels in project
By floor/area
Output Options:
sb_format- Export format:PDF report (formatted)
CSV file (spreadsheet)
Text file (plain)
Direct to printer
Schedule Types¶
Concrete Schedule¶
Output:
Panel Concrete Quantities
Panel Width Height Thick Volume Weight
P-101 12'-0" 10'-0" 6" 60 CF 9,000 lbs
P-102 10'-0" 10'-0" 6" 50 CF 7,500 lbs
...
Total: 1,200 CF = 44.4 CY 180,000 lbs = 90 tons
Note: Includes 5% waste factor
Rebar Schedule¶
Output:
Rebar Bill of Materials
Mark Size Type Length Qty Total LF Weight
A1 #5 Straight 12'-0" 40 480 1,000 lbs
A2 #4 Straight 10'-0" 60 600 800 lbs
B1 #5 U-bar 90° 8'-0" 20 160 333 lbs
...
Total Rebar: 2,133 lbs = 1.07 tons
Embed Schedule¶
Output:
Embed Hardware Schedule
Item Size Qty Unit Price Total
Weld Plate 6×6 PL6×6×1/2 120 $15.00 $1,800
Lift Insert 5000 5000 lb 80 $12.50 $1,000
Anchor Bolt 3/4" 3/4×12" 200 $3.50 $700
...
Total Embeds: $3,500
Integration¶
Data Source: All panel configurations in project Calculations: Automated quantity takeoffs Export: PDF, CSV, print
Best Practices¶
? Include waste factors (5-10%)
? Group by bar size (rebar ordering)
? Separate panels by pour (scheduling)
? Update schedules when panels change
Documentation Metadata¶
Enhancement Status: ? COMPREHENSIVE - ENHANCED [9/23 v3.60 remaining]