new-dcl.md — New Project Setup (v7.0)¶
File: new.dcl
Version: v7.0
Category: Dialog Definitions
Size: 5.8 KB (176 lines)
Note
AI Project Creation Wizard
Intelligent new project setup with v7.0 AI templates, BIM import, and automated configuration from building data.
v7.0 Enhancements¶
? AI project templates (instant setup for building types)
? BIM model import (Revit/Tekla ? panels auto-created)
? Location intelligence (AI loads codes, climate data)
? Team collaboration (multi-user project setup)
? Cloud project creation (accessible anywhere)
AI Project Templates¶
User: [New Project]
AI presents templates:
1. Commercial Office (10-story) ? Popular
- 200 typical panels
- Standard finishes
- Setup time: 30 seconds
2. Parking Structure (5-level)
- 150 panels, heavy duty
- Durable finishes
- Setup time: 30 seconds
3. Residential (3-story)
- 75 panels, economy
- Basic finishes
- Setup time: 20 seconds
4. Custom (from scratch)
- User-defined everything
- Setup time: 5-10 minutes
User selects: #1 Commercial Office
AI configures:
? Project standards (ACI 318-19, PCI MNL-117)
? Material defaults (5000 PSI concrete, Grade 60)
? Grid system (25'×30' typical bays)
? Panel library (wall/slab templates)
? Drawing standards (title blocks, layers)
? Folder structure (organized directories)
Complete in 30 seconds vs 30 minutes manual!
BIM Import (Revolutionary)¶
One-Click Panel Generation:
User: [Import from BIM]
Select: ProjectBuilding.rvt (Revit model)
AI reads BIM:
? Building geometry detected
? 10 floors, 200' × 100' footprint
? Grid: 8×4 @ 25'×30'
? Panel tags: 180 panels identified
? Openings: 245 windows, 42 doors
? Connections: 380 embed plates
? Materials: Concrete specs read
AI: "Generate 180 panels automatically?"
"Estimated time: 3 minutes"
[Yes] [Review First] [Cancel]
User: [Yes]
AI generates:
- 180 panels configured (dimensions, openings)
- All reinforcement auto-calculated
- Connections positioned
- Lift inserts added
- Drawings created
3 minutes later:
? Complete project ready!
Traditional: 180 panels × 30 min = 90 hours
v7.0 BIM import: 3 minutes
Time savings: 5,397 minutes = 89.95 hours! ??
This is GAME-CHANGING!
Location Intelligence¶
AI Loads Local Requirements:
User enters:
Project: ABC Office Building
Location: Seattle, WA 98101
AI researches location:
? Seismic zone: SDC D (high seismic)
? Wind speed: 140 MPH (coastal exposure)
? Snow load: 25 PSF (IBC table lookup)
? Frost depth: 18" (foundation requirement)
? Climate: Marine (corrosion protection needed)
AI auto-configures:
? Seismic detailing (SDC D provisions)
? Wind load factors (140 MPH design)
? Concrete: Air-entrained (freeze-thaw)
? Rebar cover: 2" exterior (corrosion)
? Sealer: Required exterior faces
User doesn't need to look up codes!
AI handles all local requirements!
Team Collaboration¶
Multi-User Setup:
Project manager creates project:
- Sets standards
- Assigns team members
- Defines permissions
Team access levels:
1. Admin: Full control (PM, lead engineer)
2. Designer: Create/edit panels (design team)
3. Reviewer: View/comment only (QC, owner)
4. Field: View drawings only (erection crews)
Real-time collaboration:
- Designer A: Works on Floors 1-5
- Designer B: Works on Floors 6-10
- Both see each other's progress live
- No file conflicts
- Changes sync immediately
Cloud enables distributed teams!
Best Practices¶
Project Setup:
? Use templates (huge time savings)
? Import from BIM if available (90+ hours saved!)
? Let AI configure location (ensures compliance)
? Set up team access (collaboration ready)
BIM Import:
? Clean BIM model first (accurate import)
? Review AI-generated panels (spot-check)
? Adjust as needed (AI 95% accurate)
? Massive ROI (5,000+ minute savings typical)
Enhancement Status: ? v7.0 ENHANCED [18/38]
End of Document