project-dcl.md — Project Configuration (v7.0)¶
File: project.dcl
Version: v7.0
Category: Dialog Definitions
Size: 5.8 KB (176 lines)
Note
AI Project Manager
Central project configuration with v7.0 AI setup wizard, team management, and progress tracking.
v7.0 Enhancements¶
? AI setup wizard (guided project creation)
? Team management (roles, permissions, assignments)
? Progress tracking (real-time dashboard)
? Resource forecasting (AI predicts needs)
? Risk analysis (identifies potential issues)
AI Setup Wizard¶
AI: "Let's set up your project. Name?"
User: "Riverside Office Tower"
AI: "Location?"
User: "Portland, OR"
AI: "? Located in SDC D (high seismic)"
"Wind: 120 MPH, Snow: 25 PSF"
"Auto-configuring code requirements..."
AI: "Building type?"
User: "10-story office"
AI: "? Typical configuration:"
"~200 panels estimated"
"Standard finishes"
"Grid: 25'×30' typical"
"Accept?"
User: "Yes"
AI: "Team size?"
User: "3 designers"
AI: "? Assigning workload:"
"Designer A: Floors 1-4"
"Designer B: Floors 5-7"
"Designer C: Floors 8-10"
"Load balanced ?"
Setup complete in 2 minutes vs 2 hours manual!
Team Management¶
Role-Based Access:
Project roles:
1. Owner: Full control (PM)
2. Engineer: Design + approve
3. Designer: Create/edit panels
4. Drafter: Drawings only
5. Viewer: Read-only (client)
Permissions matrix:
Create Edit Delete Approve Cost
Owner ? ? ? ? ?
Engineer ? ? ? ? ?
Designer ? ? ? ? ?
Drafter ? ? ? ? ?
Viewer ? ? ? ? ?
AI suggests permissions based on role
Prevents unauthorized changes
Progress Dashboard¶
Real-Time Tracking:
Project: Riverside Office Tower
Progress: 67% complete (2 weeks in)
Milestones:
? Project setup (Week 0)
? Floor 1-3 design (Week 1)
?? Floor 4-7 design (Week 2, in progress)
? Floor 8-10 design (Week 3, planned)
? Final review (Week 4)
Team productivity:
Designer A: 8 panels/day (on track)
Designer B: 6 panels/day (slightly behind)
Designer C: 10 panels/day (ahead!)
AI forecast: "Project will complete on time ?"
Resource Forecasting¶
AI Predictions:
Based on progress, AI forecasts:
Material needs (next week):
- Concrete: 85 CY
- Rebar: 12,000 lbs (#5 = 8,000, #4 = 4,000)
- Inserts: 180 lifts (15000 lb)
Order recommendations:
"Order concrete Mon for Wed delivery"
"Rebar: 2-week lead, order now"
"Inserts: In stock, order Fri"
Cost forecast:
Week 3: $45,000 (materials)
Week 4: $38,000
Total project: $285,000 (on budget ?)
Risk Analysis (NEW)¶
AI Identifies Risks:
Project risks detected:
?? HIGH: 3 panels near capacity limits
Impact: May fail QC, delay fabrication
Action: Engineer review required
?? MEDIUM: Rebar delivery delayed 1 week
Impact: Could delay schedule
Mitigation: Order from alternate supplier
?? LOW: Minor dimension variances
Impact: Negligible
Action: Monitor, no action needed
AI prioritizes risks
Suggests mitigations
Tracks resolution
Enhancement Status: ? v7.0 ENHANCED [21/38]
End of Document