dl_dlg-dcl.md — Door/Large Opening Configuration (v7.0)¶
File: dl_dlg.dcl
Version: v7.0
Category: Dialog Definitions
Size: 5.9 KB (179 lines)
Note
Door and Large Opening Management
Configure doors and large openings with v7.0 AI-powered opening optimization, structural validation, and automated frame coordination.
v7.0 Enhancements¶
New Features:
? AI opening placement (optimal location suggestions)
? Real-time structural validation (lintel capacity checks)
? Automated frame coordination (door schedule integration)
? Conflict detection (interference with rebar/embeds)
? Code compliance checking (ADA, egress requirements)
Typical Workflow (v7.0)¶
1. User adds door to 12'×10' panel
2. Opens dl_dlg, enters: 3'×7' door
3. v7.0 AI validates:
? Opening size: OK (within panel bounds)
? Lintel capacity: OK (adequate for 3' span)
?? WARNING: Door 18" from panel edge (recommend 24")
? ADA compliance: 36" min width met
?? Conflicts with rebar #5 @ 6" from left
4. AI suggests: "Move opening 6" right, clears all conflicts"
5. User accepts, opening relocated automatically
6. Frame schedule updated with door specs
Opening Types¶
Door Categories:
Personnel door (3’×7’, single/double)
Overhead door (8’×10’, vehicle access)
Service door (4’×8’, equipment)
Storefront (8’×10’, commercial)
Custom (any size)
AI Size Suggestions:
Building type: Office
AI recommends:
- Main entrance: 6'×8' (double door)
- Interior: 3'×7' (single door)
- Service: 3'×7' (rear access)
- ADA compliant: All meet 32" clear width
Building type: Warehouse
AI recommends:
- Overhead: 12'×14' (truck access)
- Personnel: 3'×7' (standard)
Structural Validation (v7.0)¶
Real-Time Checks:
As opening sized/positioned:
Lintel Check:
Span: 3'-0"
Load above: 4' × 100 PSF = 400 PLF
Required: 2-#4 bars minimum
Provided: 2-#5 bars ? OK (SF = 2.1)
Edge Distance:
Left: 18" ?? (recommend 24")
Right: 114" ? OK
Top: 36" ? OK
Bottom: 0" (at grade) ? OK
Pier Width (between openings):
Not applicable (single opening) ?
Status: PASS with 1 warning
Frame Coordination¶
Automatic Schedule Update:
Door added to panel P-105
Frame: Hollow metal frame, 3'-0" × 7'-0"
Hardware: Lockset, closer, hinges
Finish: Paint grade
Schedule entry created:
| Panel | Mark | Size | Frame Type | Hardware |
|-------|------|-------|------------|----------|
| P-105 | D-1 | 3×7 | HM | Standard |
Frame supplier notified automatically
Delivery coordinated with panel
Conflict Detection (v7.0)¶
AI Scans For:
Rebar conflicts:
?? Vertical bars #5 @ 12" o.c.
Opening interferes with bar at 36"
Solution: Relocate bar OR move opening
Embed conflicts:
?? Lift insert at 24" from left
Opening 6" away - OK ?
Weld plate conflicts:
? No conflicts detected
Utility conflicts:
?? Electrical conduit planned in wall
Verify coordination with electrical
AI provides solutions for all conflicts!
Code Compliance (v7.0)¶
ADA Requirements:
Minimum clear width: 32" (3'-0" door = 36" opening ?)
Maximum threshold: 1/2" ?
Maneuvering clearance: 60" × 60" ?
Hardware height: 48" max ?
Status: ADA COMPLIANT ?
Egress Requirements:
Minimum door width: 32" ?
Minimum height: 6'-8" (7'-0" provided ?)
Swing direction: Outward (if required) ??
Hardware: Panic hardware (if >50 occupants) ??
AI flags requirements based on occupancy type
Best Practices (v7.0)¶
Opening Placement:
? Use AI placement suggestions (optimized)
? Maintain 24” min edge distance
? Center openings when possible
? Clear conflicts before finalizing
Structural:
? Verify lintel capacity (real-time check)
? Add diagonal bars at corners (prevent cracking)
? Adequate pier width (2’-3’ min between openings)
Coordination:
? Update frame schedule immediately
? Coordinate with MEP (conduit, ducts)
? Verify ADA compliance (AI check)
Enhancement Status: ? v7.0 ENHANCED [5/38]
End of Document